Cimatron E Tutorial – ECO Manager

The update of a mold project after ECO is one of the tool designers’ most time consuming tasks. The effectiveness of the ECO Manager tool is totally independent of the project size or complexity. It does not require any regeneration. Therefore it can be used at any stage along the tool design process with the same efficiency.
The method is based on comparing the Previous ECO with the Current ECO. The results are exported to the Diff. file and are then imported to the relevant active parts

Compare the master file with the ECO 1 file

Export results to File

Update the components

Additional Engineering Changes